פצחן קטליטי עם מרסנים

In the summer of 2013 the management of an industrial plant located in the Haifa bay area decided to remove and replace one of the existing old fractionating-column tower constructed in the mid-1970s by a new tower to be supported by the original reinforced concrete (RC) base, as well as to renovate its piping connection system. The new fractionating-column tower height was 36m, 3.2m base diameter and with an operation weight of nearly 230 ton-mass.
An advanced retrofit design scheme has been adopted, using four non-linear fluid viscous dampers as energy-dissipating devices with a new bracing system.
Another challenge was the design of connection between the new tower and the RC thick plate base. This was carried out by utilizing 24 post-tensioning high strength anchor rods.
The advantages of seismic retrofit using viscous dampers namely include: the relief from retrofitting the foundation system, compliance to the very tight project schedule, and construction cost savings.